LOOK: The Balulang-Macasandig Bridge Of CDO As Of January 2020

LOOK: The Balulang-Macasandig Bridge Of CDO As Of January 2020

Mga higala! The construction of the Balulang-Macasandig Bridge in Cagayan de Oro City is now progressing steadily and various roadworks are being finished on both ends.

This 240-meter bridge connects Brgy. Balulang to the Tibasak Road in Brgy. Macasandig, and is expected to significantly reduce travel time for many Kagay-anons once opened.

Below are aerial photos and a video taken by Fel Vin Matabalan Photography this January 2020:

Balulang-Macasandig Bridge

Balulang-Macasandig Bridge

Balulang-Macasandig Bridge

Aerial video:

Watch out for updates higala!

No Comments

Post A Comment